Construction Alerts!

 

Posted Oct. 7, 2013:

Update: Due to poor weather conditions this morning, the originally scheduled chiller shutdown for the Music Building has been postponed until Tuesday October 8, 2013 from 8 AM until 12 PM, weather permitting.

 

Tuesday’s chiller shutdown for the Music Building is required so that electrical work can be performed for the chillers that serve the Music Building and the new Library. Please expect temperatures to be warmer than normal in the building until the work is completed.

 

Christopher J. Boyd

Associate Vice Chancellor, Facilities Management

 

Posted July 9, 2013:

There will be an electrical power shut down for the Film Archives Building Wednesday July 10, 2013 from 8:15 AM to 9:45 AM. Duke Energy will be relocating an existing power meter as part of the construction for the Film Production Design Facility. If you have any questions, please let me know and thank you for your cooperation and assistance during this very active  construction and renovation  period.

Stephen Dwight Atkinson, NCARB, AIA
University Architect

Posted March 6, 2013:

The City Of Winston-Salem Utility Services Department will be interrupting water service to a portion of campus on Thursday March 7, 2013 from 8:30AM to 4:00PM. The City will be installing two new valves and repairing a leaking valve during this period of time. The following buildings will not have domestic water (water for toilets, sinks, water fountains):

Film Archives

Pearce

Costume Shop

Administration

Sculpture

Aquarius

Wig & Makeup & Costume

Facilities Management

If you are in the buildings listed above during the shut-down, you will be able to use the toilets and water fountains in any building not listed above or the buildings located nearby as listed below:

Performance Place

Music Building

Design & Production

The following buildings will have fire watches posted during the main water line shut down because there were not be any water to available for the sprinkler system:

Film Archives

Wig & Makeup & Costume

Pierce

Sculpture

Moore, Sanford, and Connector

Music Building

Please refrain from using any toilets/urinals in the affected buildings during the service interruption. Facilities Management staff will be walking through all the affected buildings as soon as service is restored to make all restrooms and water fountains are working properly. Facilities Management appreciates your patience while the repairs take place.

Christopher J. Boyd

Associate Vice Chancellor, Facilities Management

 

Posted Feb. 18, 2013:

The shutdown of the water line serving the fire sprinklers for Moore and Sanford  Residence Halls and the Music Building that was scheduled for today has been cancelled due to a leak in the water line which occurred during the pressure testing of  the newly installed line. There will be a new  fire protection water line shut down for Moore and Sanford and the Music Building scheduled for tomorrow February 19, 2013 starting at 10 AM and lasting until 4 PM.  Fire watches for Moore and Sanford Residence Halls will be provided by the Campus Police.  The General Contractor will provide fire watches for the Music Building .

Thank you for your patience.

Stephen Dwight Atkinson – University Architect – 336.631.1236

 

Posted Feb. 18, 2013:

Due to the cold weather, the fire protection water line shut down has been rescheduled. The water in the testing valves is frozen and the contractor is having to thaw the testing valves. The new time for the shutdown will be this afternoon February 18  starting at 12:30 PM  and lasting until  5PM. Fire watches for Moore and Sanford Residence Halls will be provided  by Campus Police and fire watches for the Music Building will be provided by the Contractor.

For additional information please contact Stephen Dwight Atkinson – University Architect – 336.631.1236.

 

Posted Feb. 14, 2013:

Construction Activity Involving Music Building and Moore and Sanford Residence Halls

On Monday, Feb. 18, the water serving the fire protection sprinklers will be cut off from 10 a.m. to 4 p.m. so that the construction crew can connect the relocated fire protection water line serving the new Library to the existing fire protection water line serving Music Building and Moore and Sanford Residence Halls. Campus Police will be providing the fire watch in the Residence Halls and the Contractor will be providing the fire watch for the Music Building. The fire watch will be responsible for patrolling the corridors and and notifying Campus Police in the event smoke or fire is discovered. Please note that domestic water supply which is used for water fountains, toilets, showers, and kitchens will not be affected by the shutdown for the water to the fire protection sprinklers.

For additional information, please contact Stephen Dwight Atkinson, University Architect, at 336.631.1236.

 

June 11, 2012

DUKE ENERGY OVERHEAD UTILITY RELOCATION - SCULPTURE BUILDING

There will be a short electrical power outage for the Sculpture Studio Building Monday June 11, 2012 from 3:00 PM to 5:00 PM. Please turn off all computers and printers in this facility prior to 3:00 PM to prevent any damage to these devices due to a possible power surge once the electrical power is restored.

June 8, 2012

ELECTRICAL POWER OUTAGE FOR FACILITIES MANAGEMENT BUILDING

 There will be an electrical power outage today at the Facilities Management Building from 1:00 PM – 1:30 PM. Please shut down the computers and printers in this building prior to 1:00 PM to prevent any potential power surge problems with this equipment after the electrical service is restored.

June 7, 2012

 There will be a short electrical power outage for the Sculpture Studio Building today June 7, 2012 from 3:00 PM to 5:00 PM. Please turn off all computers and printers in this facility prior to 3:00 PM to prevent any damage to these devices due to a possible power surge once the electrical power is restored.

June 6, 2012

There will be an electrical power outage for the D&P Classrooms and Shops located behind the Facilities Management offices from 1:00 PM to 6:00 PM on Wednesday June 6, 2012.  IT recommends that you cut off your computers and printers prior to the shut down so as to prevent damage due to a power surge once the electricity is turned back on for the building.

June 5, 2012

There will be an electrical power outage for the Moving Images Archives Building from 2:00 PM to 5:15 PM on Tuesday June 5, 2012. IT recommends that you cut off your computers and printers prior to the shut down so as to prevent damage due to a power surge once the electricity is turned back on for the building.